Concrete Patios & Sidewalks

A concrete patio or walkway is a durable, cost-effective way to add functional outdoor space to your property. At B&F Landscaping, we install concrete patio slabs, front walks, side yard paths, and sidewalks for homeowners across Indianapolis, Carmel, Fishers, Westfield, and the surrounding areas.

We offer standard broom finish concrete for clean, practical results — and stamped concrete for homeowners who want a decorative appearance at a lower price point than pavers. Every pour is reinforced, properly based, and built for Indiana's freeze-thaw climate.

WHAT WE BUILD

Concrete Patio & Sidewalk Services We Offer

Privacy, curb appeal, low maintenance, security — every property leads with a different priority. We design to yours.

01

Concrete Patio Slabs

A concrete patio slab provides a level, durable outdoor living surface that requires minimal maintenance. Ideal for homeowners who want functional outdoor space at a lower cost than a paver patio — or as a base for future paver overlay. Standard broom and stamped finish options available.

Professionally installed concrete patio slab with outdoor seating area in a residential backyard in Indianapolis, IN.

04

Stamped Concrete Patios and Walks

Stamped concrete adds texture and color to replicate the look of stone, slate, brick, or tile at a lower installed cost than natural materials. Popular stamp patterns include ashlar slate, European fan, cobblestone, and wood plank. Color hardener is pressed into the surface and release agent provides depth and highlighting. We walk you through realistic expectations for stamped concrete — including maintenance — before you commit.

02

Front Walks and Entry Approaches

A well-proportioned front walk frames your home's entrance and improves curb appeal and safety. We install front walks with proper slope for drainage, adequate width for comfortable use, and finishes that complement your home's exterior.

Concrete front walk and entry approach with landscaped garden beds and improved curb appeal in Indianapolis, Indiana.

05

Exposed Aggregate Finish

Exposed aggregate concrete reveals the natural stone aggregate in the mix, providing a textured, non-slip surface with a distinctive natural appearance. An alternative to stamped concrete that doesn't require sealing to maintain the look.

03

Side Yard Paths and Service Walks

Concrete side yard paths provide a clean, all-weather surface between the front and back of your property — eliminating the worn grass strips and mud that develop along most home foundations. Practical, low-maintenance, and finished-looking year-round.

Professionally installed concrete side yard service walk with decorative landscaping and all-weather access in Indianapolis, Indiana.

06

Concrete Steps and Stoops

Replacement or new construction of concrete entry steps, stoops, and landings. We form and pour steps to code-compliant rise and run dimensions — no guessing on riser heights that cause trips and falls.

Stamped concrete patio installation with decorative stone-pattern finish and outdoor living space in Indianapolis, IN
Decorative exposed aggregate concrete installation featuring a textured natural stone finish at a residential property in Indianapolis, Indiana.
New concrete front steps and stoop with landscaped garden beds at a residential property in Indianapolis, Indiana.

FAQs

How much does a concrete patio cost in Indianapolis?

Standard broom finish concrete patios typically range from $5 to $9 per square foot installed. A 300 sq ft patio runs approximately $1,500–$2,700. Stamped concrete adds $4–$8 per square foot to the base price, bringing a 300 sq ft stamped patio to $3,000–$5,100. These ranges include excavation, base preparation, reinforcement, and pour. We provide detailed itemized quotes during your free estimate.

How long does a concrete patio last?

A properly installed concrete patio in Indiana should last 25–40 years. The key factors are base preparation, proper thickness (minimum 4 inches), reinforcement, correct mix design, and properly spaced control joints. Stamped concrete patios that are sealed regularly on schedule maintain their appearance longer.

Does stamped concrete require sealing?

Yes — and this is an important consideration before choosing stamped concrete. Stamped concrete should be sealed every 2–3 years to protect the color hardener and give the surface a consistent sheen. Without regular sealing, stamped concrete fades and loses its finished appearance. If you're not willing to commit to periodic resealing, a standard broom finish or paver patio may be a better long-term choice.

Can concrete crack in Indiana winters?

Yes — concrete expansion and contraction from freeze-thaw cycles is the primary source of surface cracking in Indiana. Properly installed concrete with control joints, correct mix design (air-entrained), adequate thickness, and a stable base will crack along the control joints as intended — not randomly across the surface. No concrete is entirely crack-free; the goal is managed, predictable cracking along invisible joints.

How soon can I use a new concrete patio?

Light foot traffic is possible after 24–48 hours. We recommend waiting 7 days before placing furniture or using the patio for regular activity, and 28 days before any heavy loads. We provide specific timeline guidance for your project at installation.

Can concrete patios be covered with pavers later?

Yes — a concrete slab can serve as a base for a paver overlay installation in the future. This is a common approach for homeowners who want outdoor space now and may want to upgrade to pavers later. We can pour the concrete slab with this future option in mind.

MAKE THE DETAILS COUNT

A Clean, Durable Outdoor Space at a Smart Price


Request a free estimate and we'll give you options for concrete and pavers — so you can make the right choice for your budget and goals.



Our Process

Step 1 — Free Consultation

We visit your property, discuss your goals, and assess the site. No pressure, no commitment.

Step 2 — 3D Design Rendering

We create a photorealistic rendering of your patio so you can see the finished result before we start.

Step 3 — Material Selection

We help you choose the right pavers, patterns, and finishes for your home and budget.

Step 4 — Installation

Our crew handles excavation, base prep, paver installation, jointing, and cleanup — start to finish.

Step 5 — Final Walkthrough

We walk the completed project with you to make sure every detail meets your expectations before we consider the job done.






Service Areas

  • Avon

  • Beech Grove

  • Brownsburg

  • Carmel

  • Cicero

  • Clermont

  • Crows Nest

  • Fishers

  • Fortville

  • Franklin

  • Greenfield

  • Greenwood

  • Homecroft

  • Indianapolis (county seat)

  • Lawrence

  • Lebanon

  • Martinsville

  • McCordsville

  • Meridian Hills

  • New Palestine

  • Noblesville

  • North Crows Nest

  • Plainfield

  • Rocky Ripple

  • Sheridan

  • Shelbyville

  • Southport

  • Speedway

  • Spring Hill

  • Warren Park

  • Westfield

  • Williams Creek

  • Wynnedale

Not sure if we cover your area?

Call us at (317) 772-4753 and we'll let you know.